.

MundoAndino Home : Andes Venezuela Guide at Mundo Andino

List of Caracas Metro stations

The Caracas Metro (referred as El Metro by locals) is a rapid transit system operating in Caracas, capital of Venezuela.

Below is a list of the Caracas Metro subway lines and the stations that they serve.

Line 1 (Orange)

From west to east:

Propatria

Perez Bonalde

Plaza Sucre

Gato Negro

Agua Salud - Future point of transfer to Line 6.

Cano Amarillo

Capitolio - Point of transfer to Line 2.

La Hoyada - Future point of transfer to Line 3.

Parque Carabobo

Bellas Artes

Colegio de Ingenieros

Plaza Venezuela - Point of connection to Line 3 and Line 4.

Sabana Grande

Chacaito

Chacao

Altamira

Parque del Este - Future point of connection to Line 4.

Los Dos Caminos - Future point of trasfer to Line 6.

Los Cortijos

La California

Petare

Palo Verde

Line 2 (Green)

From north-east to south-west:

El Silencio - Point of transfer to Line 1.

Capuchinos - Point of connection to Line 4.

Maternidad - Point of connection to Line 4.

Artigas - Point of connection to Line 4.

La Paz - Point of connection to Line 4.

La Yaguara - Point of connection to Line 4.

Carapita - Point of connection to Line 4.

Antimano - Point of connection to Line 4.

Mamera - Point of connection to Line 4.

Caricuao

Zoologico

Ruiz Pineda - West ramification serviced exclusively by Line 4.

Las Adjuntas - Serviced exclusively by Line 4, - transfer station to (Los Teques Metro).

Line 3 (Blue)

From north-east to south-west:

Plaza Venezuela - Point of connection to Line 1 and Line 4.

Ciudad Universitaria

Los Simbolos

La Bandera

El Valle

Los Jardines - expected completion and service by 2008.

Coche - expected completion and service by 2008.

Mercado - expected completion and service by 2008.

La Rinconada - IAFE rail station, both completed and in service.

Next phase (project). Begins as a west ramification from El Valle station to north on San Jose station

El Valle

Prado de Maria

El Peaje

San Agustin

Fuerzas Armadas - Point of transfer to line Line 1 and Line 4

Urdaneta

San Jose

Line 4 (Red)

Construction works for next phase were initiated 18 March 2007 and expected to be completed by year-end 2011. Please note Line 4 was renamed and incorporated as part of Line 2 shortly after its inauguration.

Capuchinos - Point of connection to Line 2.

Teatros

Nuevo Circo

Parque Central

Zona Rental - Point of connection with Line 1 and Line 3.

Next phase - From west to east:

Bello Monte

Las Mercedes

Tamanaco - Future point of connection to Line 5.

Chuao

Bello Campo

Parque del Este II - Point of connection to lines Line 1 and Line 6.

Line 5 (Magenta)

This line is still under project.

From north to south:

Santa Ana

Santa Paula

San Luis

Santa Marta

Chuao

Tamanaco - Point of transfer to Line 4

San Roman

Santa Fe

La Ciudadela

Prados del Este

La Iglesia

Baruta

La Trinidad

La Boyera

Los Geranios

El Hatillo

Line 6 (Yellow)

Most of this line is still under project.

From west to east:

Magallanes

Gato Negro

Agua Salud - Point of transfer to Line 1.

Miraflores

Urdaneta - Point of transfer to Line 3.

San Bernardino

Guaicaipuro

Mariperez

Las Palmas

Chapellin

La Castellana

Avila

''Santa Eduvigis'- Point of transfer to lines Line 1 and Line 4'

The following stations found in the City of Caracas are in construction under a project known as Guarenas / Guatire Metro.

Parque del Este - Point of transfer to lines Line 1 and Line 4 Montecristo- Point of transfer to line Line 1 Boleita Horizonte La Urbina Sur La Urbina Norte- Point of transfer to the Light Rail Service, Guarenas-Guatire

Los Teques Metro (Navy Blue)

Las Adjuntastransfer station to Caracas Metro Line 4 Ali Primeraformerly El Tamborstation

The following stations are in construction

Guiacaipuro- projected completion date set for 2010

Miranda- projected completion date set for 2010

Los Cerritos- projected completion date set for 2012

Carrizal- projected completion date set for 2012

Las Minas- projected completion date set for 2012

San Antonio- projected completion date set for 2012

Guarenas / Guatire Metro (Green Grass)

The following stations are in construction

La Urbina Nortetransfer point Caucauguita- projected completion date set for 2012 Tamarinda- future project Guarenas I- projected completion date set for 2012 Guarenas II- projected completion date set for 2012 Guatire I- projected completion date set for 2012 Guatire II'' - projected completion date set for 2012

External links

Metro de Caracas, C.A.

UrbanRail > America > Venezuela > Metro de Caracas

Didn't find what you were looking for.
Need more information for your travel research or homework?
Ask your questions at the forum about Rapid transit in Venezuela or help others to find answers.

This article is licensed under the GNU Free Documentation License. It uses material from the Wikipedia article List of Caracas Metro stations


Disclaimer - Privacy Policy - 2009
hit counters